Stronger Foundations, Greater Innovations – RINGFI New Factory Coming Online

Stronger Foundations, Greater Innovations – RINGFI New Factory Coming Online

  1. A Foundation Is More Than Concrete
    “STRONGER FOUNDATIONS” is welded into every steel beam of our new 30,000 m² smart plant.
  • Industry 4.0 kiln keeps ΔT within ±1 °C and cuts glaze defects by 35%.
  • 20,000 m² rooftop solar + waste-heat loop saves 3.2 GWh and 2,100 t CO₂e per year.
    The foundation we pour is a green protocol for next-gen sanitary-ware.
  1. Innovation Starts with Empathy
    We translated user pain points into six specs: quiet, water-saving, easy-clean, durable, fast-install, customisable.
    The first flexible line switches bowl height, rough-in and colour in 15 minutes, shrinking OEM lead-time to 7 days.
    Innovation means our partners win first.
  2. Integrity & Win-Win – Livestream the QC Room
    Every product ships with “One Code, One Book”:
  • Scan to see 42 raw test records
  • Scan to join a WhatsApp/WeChat group with the engineer who signed the report
    Transparency builds trust; trust builds long-term profit.
  1. “NEW FACTORY LOADING…” Progress Bar
    Equipment 85% installed; full ramp-up Q2 next year.
    Early-bird slots open now:
    ① Dual-factory schedule = 20% faster delivery
    ② Shared R&D lab = 50% off co-development cost
    ③ Green kWh allocated to your order = direct CBAM carbon-cut
  2. An Open Invitation
    Stronger foundations are set; greater innovations are ready to deploy.
    Search “RINGFI”, tap WhatsApp +86 13192117136,
    and let’s pull the progress bar to 100%—with your brand on the next industry refresh.
Regresar al blog